Revision log
Every substantive change made to this site, dated, newest first. The Methodology undertakes that corrections are recorded rather than made silently. This is where that record is kept.
What is recorded here
A change to what an entry says, a change to a status or a count, a correction, a new page, or a change to the method by which anything is judged. Typographical fixes, broken links and layout work are not recorded; they alter nothing a reader would rely on.
Where a correction changes a published figure, the figure as it previously stood is stated, not just the figure as it now reads. A log that records only the new number is of no use to anyone checking the old one.
20 November 2026
- New briefing — A Cadence Is Only a Cadence If It Keeps
Time
On the quarterly meeting cadence agreed by the African Union and CARICOM reparations mechanisms on 17 June 2026, the first quarterly meeting falling due around September 2026, and the absence of any public record that it was held.
- Homepage — reparatory justice pillar revised
The pillar read: “The political centre of the 2025 summit, and the fastest-moving workstream on the record: from announcement to a first joint mechanism meeting in nine months.” It now carries the same nine-month fact and adds that the mechanism agreed to meet quarterly and that the first quarterly meeting cannot be found. The original wording was published on the strength of the June 2026 meeting and was accurate when written; it is revised because the subsequent record does not support “fastest-moving” as a present-tense claim.
- Commitments tracker — two entries added under
Adjacent instruments
The CRFM–ATLAFCO/COMHAFAT memorandum of understanding announced 3 November 2026, and the Ghana–Trinidad and Tobago air services agreement signed in September 2026. Neither is an AU–CARICOM commitment and neither is counted as one. No existing entry, status, deadline or count was altered. The tracker still carries 26 rows and the status tiles still read 6 / 7 / 3 / 10. The section now holds four entries rather than two, and its introductory note was rewritten accordingly.
- Commitments tracker — standfirst date moved
The “last updated” line read 2 November 2026. It now reads 20 November 2026.
- Homepage and briefing index — new briefing listed
2 November 2026
- New briefing — The First Direct Link Is Still a Feasibility
Study
On the DiasporaLink Act, H.R. 3385 in the 118th Congress and H.R. 1737 in the 119th, which would assess the feasibility of a submarine cable from the United States to Ghana and Nigeria routed through the US Virgin Islands.
- Commitments tracker — new section, Adjacent
instruments
Two entries added: the DiasporaLink Act, and the memorandum of understanding signed between Ghana and the US Virgin Islands in January 2026. Neither is an AU–CARICOM commitment and neither is counted as one. No existing entry, status, deadline or count was altered. The tracker still carries 26 rows and the status tiles still read 6 / 7 / 3 / 10.
- Methodology — three sections added
First, the status of the US Virgin Islands: CARICOM's published membership lists fifteen Member States and eight Associate Members and the territory appears on neither, so it is treated here as neither, pending an instrument. Second, a definition of "adjacent instruments" as a third category alongside commitments and continental context. Third, a declared interest — the author's consulting practice has a professional interest in compliance work connected to the former refinery site on St. Croix, which is named in material on this site.
- The Tankers Did Not Wait for a Summit — postscript
added
On the Ghana–US Virgin Islands memorandum, and on the storage capacity at the St. Croix terminal — reported at up to 34 million barrels across 167 tanks with 11 docks. The byline now carries the revision date alongside the publication date.
- Commitments tracker — standfirst date corrected
The "last updated" line read 8 September 2026. It now reads 2 November 2026. The page had in fact been revised on 15 October and the line was not moved with it.
- Homepage and briefing index — new briefing listed
- This revision log created
15 October 2026
- New briefing — The Tankers Did Not Wait for a
Summit
On the growth in refined product movement between West Africa and the Caribbean, and on the fact that it required no agreement, institution or secretariat.
- Commitments tracker — three entries added, status tile counts
corrected
Three entries added under later commitments and announcements. The four status tiles were corrected to read 6 / 7 / 3 / 10, verified by counting the status attribute on all 26 rows rather than by carrying the previous figures forward.
- Homepage and briefing index — new briefing listed
8 September 2026
- Commitments tracker reviewed and its "last updated" line set to that date.
7 September 2026
- New briefing — The Eighth Summit Will Be the Third
Published on the day the sixth summit fell due under paragraph 19 of the 2021 communiqué, and was not convened.
- Commitments tracker — correction
The undertaking to hold the 2nd Summit and the undertaking to adopt governance constitutive statutes at it had been recorded as a single entry, marked delivered. They are separate commitments and were separated: the summit was held, 36 months late, and the statutes remain unestablished. The count of 2021 commitments moved from thirteen to fourteen, and the number carrying a deadline from three to four. The correction notice remains published on the tracker page itself.
August 2026
- New briefing — Five Billion Dollars Will Not Fix
It
On IMF research into the Caribbean connectivity constraint and what it implies about where the partnership's money is going.
This log opens in August 2026. Changes made before that date are not recorded, and this page does not claim otherwise. Where a page carries no entry here, it has not been substantively revised since the log opened. If a change has been made to this site that is not recorded above and should be, that is itself a correction — please write to info@africaricom54.com.